Production
Accelerating field production to generate
early cash flow.
Conventional subsea single production well design requires the well to be drilled and completed with the drilling vessel before flow lines pull-in, connection of umbilicals, etc. are undertaken with another specialized vessel. This costly time delay between well completion and production start-up, sometimes amounting to several weeks can be reduced with CAN.
CAN technology enables marine and SURF operations to be carried out before the rig arrives on location, saving time, costs and giving reduced project execution time and early production.
A facilitator for wider technology
The CAN-integrator may be used as a facilitator for other technologies, including modular equipment such as skids, boosters and injection pumps. It also offers unparalleled load capacities for single production wells, and its unique design lends itself to easy integration of protection structures and efficient pre-installation of other infrastructure like flow lines, etc.