Solutions_WC.png

Subsea Template Solutions

We have remastered the pre-rig well construction process and design for the subsea template market. 

Neodrill circle.png

OUR PATENTED SOLUTIONS

Improving safety and well integrity, all our subsea template solutions can be used across wells of varying conditions. 

 

These patent protected solutions will result in an estimated rig time saving of 2-4 days per well, or projected savings in the range of 80-100 million NOK per 4 slot template. 

BOP / soft valve landing

A typical BOP weighs between 250 to 450 tonnes. The impact this can have is significant and can potentially lead to instability in the well foundation.

Our soft landing and BOP/X-mas tree support has been carefully designed to transfer the load away from the wellhead. This process ensures fatigue life is improved, which directly results in enhanced well life.

Patent reference: NO331978

(NO, UK, US, AS, BR, CA, CN)

Cementing system

With a unique, fit-for-purpose design, the cementing system guarantees full control of the cement level throughout the installation process.

Patent reference: NO341732

(UK, US, AU, BR, CN)

AVAILABLE WORLDWIDE

ND_WorldMap_#272c31.png

NEXT STEPS

Learn about CAN enabled solutions

Group 85.png

See how CAN-complete can streamline your CAN installation

Group 20.png

Speak with an expert