Track Record
Each installation saves an average of 2-4 rig days and 500 tons CO2 emissions.
Explore Neodrill's track record by interacting with the map below. Use the search filters, click on points, or countries for more information. Detailed search results are available below the map.
Number of CAN-installations:
N/A
Search
2006
2025
0
1500
5
20
Search Results

Dvalin Nord
Harbour Energy
6507/7
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Norwegian Sea
406m
8.50 m
0.30°
8.5 hrs
CAN-parking
Xmas tree / OWWS parking

Zagato North
Vår Energi
7122/8-4 S
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Barents sea
405.6 m
13.0 m
0.16°
6.05 h
CAN-ductor
Exploration

Pelican South
OMV Petrom
VXT581003 PS 1-3
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Black Sea
124 m
10.00 m
0.40º
13 hrs
CAN-integrator
Production

Dvalin Nord
Harbour Energy
6507/7
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Norwegian Sea
406m
8.50
0.29°
6 hrs
CAN.parking
Xmas tree / OWWS parking

Pelican South
OMV Petrom
VXT581002 PS 1-1
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Black Sea
124 m
10.00 m
0.28º
18hrs
CAN-integrator
Production

Pelican South
OMV Petrom
VXT581001 PS 1-4
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Black Sea
124 m
10.00 m
0.53º
19 hrs
CAN-integrator
Production

Blåmann
Vår Energi
7121/9-2
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Barents Sea
338 m
12.7 m
0.18°
8.25 h
CAN-ductor
Exploration

Pelican South
OMV Petrom
VXT581004 PS 1-2
Year
Region
Water depth
Length
Final inclination
Installation time
2025
Black Sea
124 m
10.00 m
0.23º
16 hrs
CAN-integrator
Production

Nova W-3
Harbour Energy
35/9
Year
Region
Water depth
Length
Final inclination
Installation time
2024
Norwegian Sea
369 m
11.00 m
0.23º
20 hrs
CAN-parking
Xmas tree parking