top of page

Conductor Anchor Node (CAN) features on the cover of the AOG issue of Oil & Gas Australia

In conjunction with Australian Oil & Gas 2018 an image of the CAN, during fabrication in a Batam construction yard has been featured on the front cover of Oil & Gas Australia.

Together with our Perth based partner, ICON Engineering Pty Ltd we designed, fabricated and installed the first Conductor Anchor Node (CAN) in SE Asia. The CAN forms the beginning of an exploration well, providing huge load capacity in soft soils. The CAN is pictured here in a Batam construction yard prior to loading and seafastening. For more information on the Ferrand-1 project for Wood Energy click here

Welcome to

our blog

Let us tell you how our innovative solutions deliver real value and the potential to do more. We use this space to share what we know and what we are thinking.

About Neodrill

We create greener, cost efficient solutions for exploration and production wells by developing pre-rig well construction.

Resources

Follow Neodrill

  • LinkedIn
bottom of page