Menu

THE SMARTER CHOICE FOR YOU SUBSEA PRODUCTION WELLS

  • Top hole savings

    2-4 days off drill rig time
    One conductor length
    No cuttings
    No mud usage

  • Equipment on CAN

    Conductor (LP and HP)
    Manifold
    Flow line tie in anchor
    Umbilical tie in anchor
    Protection structure (if relevant)

  • Risk mitigation

    Reduce project and schedule risk
    Load capacities
    Accidental load capacity
    Equipment integrated and tested in workshop
    Fatigue management
    Confirmed conductor verticality

  • Environment

    Less CO2 emissions due to
    No cement
    No spud mud

  • Improved HSE

    Handling of conductor
    Reduces heavy lifts